
Please try another search
Luxe Green Energy Technology Co., Ltd. engages in the design, manufacture, installation, and sale of high and low voltage distribution panels and various electrical and electronic equipment in Taiwan. The company operates through Electric Business Group, Electrical Engineering Business Group, and Construction Business Group segments. It offers energy solutions, including solar power plant monitoring and maintenance systems, DC distribution panels, and solar power plant construction and planning services. The company also offers electrical equipment comprising various transformers and matching system reactors. In addition, it provides switchboard products, such as solar power high voltage substations, high and low voltage switchboards, metal clad switchgear distributive panels, low voltage motor control centers, gas isolated switchgear facilities, and power centers, as well as test equipment, including electrical test benches, voltage-withstand test bedsteads, and temperature rise test panels. The company was formerly known as Klingon Aerospace Inc. and changed its name to Luxe Green Energy Technology Co., Ltd. in August 2022. The company was founded in 1978 and is headquartered in Tainan City, Taiwan.
Name | Age | Since | Title |
---|---|---|---|
Pin-Chun Chen | 33 | 2022 | Director |
Chieh-Jen Chen | - | 2022 | Charman of the Board |
Kuo-Fang Yu | - | 2022 | Director |
Tung-Han Yang | - | 2022 | Independent Director |
Lient-Sung Chen | - | 2022 | GM, President & Director |
Chin-Lung Liu | - | 2017 | Director |
Chao-Lai Chen | - | 2022 | Independent Director |
Hsieh-Chia Chen | - | 2022 | Director |
Chia-Yung Cheng | - | 2022 | Director |
Fu-Tsai Liu | 73 | 2017 | Director |
Fang-Ju Lin | - | 2025 | Independent Director |
Yu-Han Chang | - | 2025 | Director |
Are you sure you want to block %USER_NAME%?
By doing so, you and %USER_NAME% will not be able to see any of each other's Investing.com's posts.
%USER_NAME% was successfully added to your Block List
Since you’ve just unblocked this person, you must wait 48 hours before renewing the block.
I feel that this comment is:
Thank You!
Your report has been sent to our moderators for review