Please try another search
Shenzhen Sinexcel Electric Co.,Ltd. provides energy internet core power equipment and solutions in China and internationally. The company offers industrial supporting power supply products, such as active power filter, static VAR generator, three-phase unbalanced control device, dynamic power supply, low voltage line voltage regulator, voltage regulator, uninterruptible power supply, laser generator power supply, single crystal silicon furnace heating power supply, etc. It also provides energy power conversion equipment products, including energy storage converters, DC converters, inverter-boost integrated cabins, and prefabricated cabinet-type and box-type semi-integrated energy storage systems. In addition, the company offers electric vehicle charging and battery replacement equipment comprising DC piles and AC piles, integrated and split types, and other product types; charging pile modules covers; and battery swap products, as well as battery formation and testing equipment, such as lithium battery and lead-acid series battery formation and testing equipment. Shenzhen Sinexcel Electric Co.,Ltd. was founded in 2007 and is headquartered in Shenzhen, China.
| Name | Age | Since | Title |
|---|---|---|---|
| Liu Yang | 52 | 2021 | CFO, Accounting Supervisor, Deputy GM & Director |
| Jiancheng Li | 52 | 2021 | Independent Director |
| Jin Xiao | 51 | 2021 | Vice Chairman |
| Xiaoliang Wei | 49 | 2015 | Non-Independent Director |
| Chen Jinglin | 53 | 2021 | Independent Director |
| Jing Ye | 33 | 2021 | Non-Employee Supervisor |
| Xing Fang | 53 | 2015 | Chairman of the Board of Directors & GM |
| Han Li | 55 | 2018 | Non-Independent Director |
| Bin Guo | 54 | 2021 | Chairman of the Supervisory Board |
| Qianwen Liu | 31 | 2021 | Supervisor |
Are you sure you want to block %USER_NAME%?
By doing so, you and %USER_NAME% will not be able to see any of each other's Investing.com's posts.
%USER_NAME% was successfully added to your Block List
Since you’ve just unblocked this person, you must wait 48 hours before renewing the block.
I feel that this comment is:
Thank You!
Your report has been sent to our moderators for review